hestan Pro Canopy KVP Serie Manuel page 18

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
9. Mark the wall at the lower edge of the hood opening:
If using a duct cover:
EN
a) Carefully remove the knockouts from the top four corners of the hood.
b) Remove the duct cover from its packaging and remove the mounting screws from the
c) Place the duct cover on the top of the hood and secure it temporarily through the knock-
The front panel may be removed from the duct cover during handling to reduce weight.
Lift the hood (and duct cover assembly if used) to the location on the wall where it will be
installed.
Lightly mark the wall with a short, horizontal mark along the bottom edge of the hood.
When finished, remove the hood and duct cover assembly from the wall.
10. Find location of mounting strip:
a) On the back side of the hood, measure the distance between the bottom edge of the hood
and the top edge of the wood mounting strip.
b) Measure this distance above the horizontal mark made in Step 9 and lightly mark the wall
with a level, horizontal line.
c) Measure where the center (left to right) of the hood will be and mark the upper, horizontal
line on the wall with a short, vertical centerline.
11. Attach the mounting strip to the wall as follows:
a) Remove the screws inside the top of the back of the hood that retain the wood strip that is
recessed in the mounting channel. Note: Some retaining screws may be located behind the
blower(s).
b) Remove the wood mounting strip from the back of the hood and place the top edge of the
strip on the upper, level, horizontal line on the wall.
c) Referencing the vertical centerline from Step 10, place the mounting strip on the wall so it is
centered (left to right) in the space where the hood will be located. Mark the strip at two
or more stud locations, and drill clearance holes in the strip to prevent splitting.
d) Using proper hardware, attach the mounting strip to at least two wall studs.
Note: for 48" and larger hoods, three screws into studs are recommended.
12. FOR BACK VENTING APPLICATIONS ONLY. IF NOT BACK VENTING, PROCEED DIRECTLY
TO STEP 13.
Note: Wall studs may interfere with back venting installations. Additional framing may be
required. It is necessary to cut duct access hole(s) in the wall prior to installing the hood.
If using a duct cover, this step may be done with the duct cover removed from the hood. The
duct cover must still be mounted to the hood before mounting the hood to the wall.
Method 1:
Hold the hood on the mounting strip by aligning the channel at the top of the back of the
Place the appropriate elbow(s) on top of the hood in line with the hood exhaust collar(s).
14
©2018 Hestan Commercial Corporation
(CONT.)
base of the duct cover.
out openings using the mounting screws previously removed.
hood over the wood mounting strip on the wall.
On the wall, trace around the elbow(s). Remove the hood and elbow(s) from the wall.

Publicité

Chapitres

Table des Matières
loading

Table des Matières