Safety Guidelines

Adjustment of pressure setting and repair operations
may only be carried out by the manufacturer. Under no
circumstances shall the safety valve be disasembled
The product must not be used in a damaged condition
and must be installed according to regulations, with
special regard to safety. Installation must be in
accordance with these instructions. It is essential that
any faults which may influence safety be rectified
immediately
Safety valves of the type S245 are exclusively for the
applications listed in the specification sheet. No other
application is permissible
2

Technical Data

Media
Medium:
Connections/Sizes
Connection sizes:
Discharge rate
TÜV  w:
ASME Kd:
Operating temperatures
Max. operating temperature
medium:
Note:
Certified to Pressure Equipment Directive 2014/68/EU,
Identification number of notified body 0035
CAUTION!
Not suitable for steam.
3

Assembly

3.1 Installation Guidelines
Safety valves for pressurised air should be positioned
vertically, facing upwards in the pipeline or on a
pressure vessel. Other installation positions on
request
Connections through all pipe, fittings and
nonreclosing pressure relief devices (if installed)
between a pressure vessel and its safety valve shall
have at least the area of the safety valve inlet
Compressed air. Non-toxic,
non-corrosive and non
inflammable gases which
may be discharged to
atmosphere.
Not suitable for oxygen and
steam.
1
G
/
" - G 2"
2
0.73
0.863
180 °C (ASME), 260 °C
(TÜV / CE)
GB
The characteristics of the upstream system shall be
such that the pressure drop will not reduce the
relieving capacity below that required or adversely
affect the proper operation of the safety valve
The opening in the vessel wall shall be designed to
provide unobstructed flow between the vessel and its
safety valve
There shall be no intervening stop valves between the
vessel and its safety valves
A set pressure function test should be carried out at
least once per year. The detailed test procedure is
determined by the user
Requires regular maintenance in accordance with
EN 806-5
3.2 Assembly instructions
1.
Visually inspect the cap, thread and plug for damage.
• A damaged valve must not be fitted.
2.
Seal the valve with hemp, sealing tape or a copper
gasket.
3.
Screw the valve in tight using a suitable wrench and
avoid damaging the valve.
4

Commissioning

1.
Turn the adjusting knob clockwise until it tightens.
The valve is now ready for service.
CAUTION!
If the installation is taken out of service for along
period, then the unit should be turned to the venting
position. This is acheived by turning the adjusting
knob 2 turns anticlockwise.
5

Maintenance

Ensure dirt does not build up around the discharge area of the
safety valve.
6

Function Tests

The intervals for function checks of the safety valves must be
fixed by the operator of the installation under consideration of
the local requirements for pressure tanks (at least once a year
according to the recommendation of the manufacturer). The
facility operator should ensure that the function tests are
carried out regularly by an authorized person.
4