GB
the struts.
This provides the necessary stability for the front
wall.
PAGE 31
Installation of the rear wall assembly
Repeat steps 1 to 6.
Important: In step 1 "Pre-assembly of the floor
profile", use the floor gusset plate, art. no.
84.620.21 in place of the mounting bracket, short,
art. no. 84.631.51.
Working from the outside, attach the gusset plate to
the floor profile at the two upper holes using two
hexagon bolts and nuts. After step 6 in the assembly
go straight to step 9.
9: Assembly of the struts (rear wall)
PAGE 32
9/c: Make sure that the strut with the three pre-
assembled bolts is inserted in the middle.
PAGE 34
Reference diagram (internal view)
Note: The cutouts on the floor profile and the
crossmember marked with an X in the reference
diagram stay free. Make sure that the strut with just
three pre-assembled bolts is inserted in the middle.
Check the distances between the bolts.
PAGE 35
10: Installation of the wind bracing and struts on
the rear wall
Note: Make sure that the struts are installed
horizontally. If necessary, use a spirit level to check.
PAGE 37
10/d + 10/e
Install the two bottom struts (DT) (602 mm) in such a
way that the angled wind bracing fits in front of the
one strut and behind the other (see Fig. 10/e).
PAGE 38
Note: Make sure that the struts are installed
horizontally. If necessary, use a spirit level to check.
Carefully tighten the bolts on the wind bracing and
the struts. This provides the necessary stability for
the front wall.
PAGE 39
11 Pre-assembly of the side floor profile
Middle drawing: Assembly preview - 2 panels
Bottom drawing: Assembly preview - 3 panels
6
PAGE 40
Top drawing: Assembly preview - 4 panels
11/a: Only for 4-panel shed (perform assembly step
twice); this step does not apply to the 2-panel and 3-
panel shed
PAGE 41
11/b: Only for 4-panel shed (perform assembly step
twice); this step does not apply to the 2-panel and 3-
panel shed
11/c: Slide one bolt into each pre-assembled floor
profile guide rail. The bolt should be approx. 10 cm
from the edge.
PAGE 42
12 Pre-assembly of the rain guttering
Middle left drawing: Assembly preview - 2 panels
Middle right drawing: Assembly preview - 3 panels
Bottom drawing: Assembly preview - 4 panels
PAGE 43
12/a: Only for 4-panel shed (perform assembly step
twice); this step does not apply to the 2-panel and 3-
panel shed
12/b: Only for 4-panel shed (perform assembly step
twice); this step does not apply to the 2-panel and 3-
panel shed
PAGE 44
12/c: Only for 4-panel shed (perform assembly step
twice); this step does not apply to the 2-panel and 3-
panel shed
12/d: Fit a hexagon head bolt with nut in the empty
holes on the top strip.
PAGE 45
13: Pre-assembly of the ridge
Note: Step 13 (13a - 13c) is only required for the 4-
panel shed. The ridge must not be pre-assembled for
the 2-panel and 3-panel shed.
13/a: Slide the bolt with the fluted side first into the
designated opening of the ridge profile. Tap the bolt
halfway into the profile.
PAGE 46
13/b: Slide the connecting part halfway into the floor
profile.