how to Set up and disassemble
1
PArTIALLY exTeNd THe sHeLTer frAMe
NOTE: Do not unfold frame completely. This will allow easier
fit for draping shelter top over frame.
3
seCUre ANd exTeNd sHeLTer TOP
push
button
5
INsTALL THe sHeLTer LIGHTING eNerGY PACk ON LeG Or IN BAG
Tabs
energy
pack
5
dIsAsseMBLY
To take down the shelter, follow the previous steps and illustrations in
the reverse order.
2
ATTACH THe sHeLTer TOP
Vent Support
4
AdjUsT THe HeIGHT ANd seCUre THe sHeLTer
push
button
power
cord
Switch
The Coleman Company, Inc. • 3600 North Hydraulic • Wichita, Kansas 67219 U.S.A.
1-800-835-3278 in the United States • www.coleman.com
© 2016 The Coleman Company, Inc. All rights reserved.
Coleman
®
,
and
are registered trademarks of The Coleman Company, Inc.
the hook-and-
loop fastener
clip
power cord storage
energy pack
in bag
4010046950 (ECN20057683-02)
Guyline
Stake