Axis T99A10 Mode D'emploi page 22

Table des Matières

Publicité

AXIS T99A10 Positioning Unit 24 V AC/DC
5
Bottom cable hole
1. Install the optional conduit adapters (not included).
2. Connect the grounding braid to the grounding screw.
3. Insert the power cable, I/O cable and network cable through the hole in the base unit as
shown in the illustration above. Alternatively insert them through the bottom cable hole.
4. Insert the power cable through the strain relief with a distance of 530 mm (21 in) from
the strain relief to the end of the cable.
1
I/O cable (optional, not included)
2
Network cable (not included)
5. Insert the I/O cable (optional) through the strain relief with a distance of 420 mm (16½
in) from the strain relief to the end of the cable.
6. Insert the network cable (optical fiber cable and/or RJ45 cable) through the strain relief
with a distance of 580 mm (23 in) from the strain relief to the end of the connector.
For more information on different network connectivity options, see Install the network
link on page 26.
7. Close and tighten the three strain reliefs.
22

Publicité

Table des Matières
loading

Table des Matières