Periodical Maintenance - V.ORLANDI GA25 Instructions De Montage, D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS

4.1 PERIODICAL MAINTENANCE

This chapter refers also to the figure on page 16/24.
Depending on the use and at least annually the coupling shall be
N
checked for wear by skilled staff.
O
T
The following checks and controls are recommended:
E
Control the coupling up system:
1)
If the wear of the coupling pin (3) or of the lift lever (2) exceeds
the limits shown on page 15/24, those parts shall be replaced with
new ones immediately : see chapter 5.1 REPLACEMENT OF THE
COUPLING PIN page 17/24, chapter 5.2 REPLACEMENT OF THE
RELEASE LATCH AND OF THE RELEASING SPRING page 18/24,
chapter 7 DISPOSAL page 22/24.
DRAWBAR COUPLING GA25
13
5
PAG.
14/24
CHAP . 4
REV. A
10°

Publicité

Table des Matières
loading

Table des Matières