Installation Advice; Commissioning And Functional Check - G-U GU-SECURY Automatic Panik SECURY 19 Notice De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

General installation instruction
GU-SECURY Automatic Panik |SECURY 19 | SECURY 21
Multi-point locks
1.3
Check the locking system for completeness, as well as the approvals for
the individual components.
Insert the multi-point lock into the prepared lock recesses and fix the
multi-point lock in place.
Fix the keepers (latch&deadbolt striker/strikers) into the door frame or
passive leaf. The latchbolts must be able to glide into the keepers freely
and without friction at all times. If necessary, adapt the keeper shapes to
the door situation (Fig. 2).
Install the locking cylinder (if present).
Do not tighten the cylinder fixing screw yet.
Mark the fixing points for the door hardware on the inside and outside of
the door using the drilling template provided.
Remove the locking cylinder (if present) and multi-point lock from the
lock recesses.
Drill the fixing borehole from the marked points to the lock recesses.
Reinstall the multi-point lock and locking cylinder (if present) as
described in Sections 2 and 4.
Install the door hardware in accordance with the enclosed instructions
and then tighten the cylinder fixing screw.
While the door is open, perform a functional check of the locking system.
1.4
After installing the multi-point locks, lubricate the rear of the completely
extended latchbolts using a non-resiniferous grease.
While the door is open, perform a functional check as described in the
following:
EN
22

Installation advice

Commissioning and functional check

Release the latchbolts by pushing the trigger lever in the locking
direction. The latchbolts will extend by 20 mm.
04.2016 | G26788 | Designed in Germany

Hide quick links:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gu-secury automatic panik secury 21Secury 19Secury 21

Table des Matières