FIXING INSTRUCTIONS
Technical Data RMZ
Input:
Output:
Type of protection:
Protection class:
Smoke switch:
Temperature:
Technical Data EMF
Operating voltage:
Power input:
Rated for continuous
duty:
Release torque:
Door opening angle:
The unit is controlled by the RMZ smoke detector
• Work on electrical equipment and systems may
only be performed by properly trained specialist
personnel.
• Check to ensure that the line power supply (230 V
AC) has been disconnected and is no longer live.
• 10A/B miniature circuit breaker must be provided
in the supply circuit. This can also be used as the
isolator for disconnecting the RMZ and making it
dead.
• The power cable leading to the RMZ must be
properly secured to ensure effective strain relief.
• The power cable (NYM) conductor cross section
should not be greater than max. 1.5 mm
conductor is not electrically utilised. The terminal
(PE) should, however, be used where a PE conductor
is provided.
• Fire/smoke detectors controlling hold-open
systems must not be used to actuate any further
alarm devices (e.g. fire alarm transmission
☞
systems).
• If the optional alarm module is installed, the cable
connecting it to the smoke switch must be led over
and across the measurement chamber in order to
ensure that smoke penetration is in no way
hindered.
Approval certification
The G - SR has been approved by the State Material Testing
Authority, Dortmund, for use on double (two-leaf) fire/
smoke check doors in Germany.
A separate approval certificate is required in conjunction
with the fire/smoke check door concerned (e.g. where DIN
standards apply) – check local regulations.
Abbreviations
= Active leaf
G
= Inactive leaf
S
GSR
= Slide channel-type door co-ordinator
GSR EMR 1
= with electro-mechanical hold-open for
the inactive leaf
GSR EMR 2
= with electro-mechanical hold-open for
the inactive and active leaves
GSR EMR 1G
= with electro-mechanical hold-open for
the active leaf
G - SR EMR
230 V AC +10%/-15%
120 mA/28 VA / 50 Hz
24 V DC /460 mA / 11 W
IP 30
II
24 V DC/50 mA
-20°C/+60°C
24 V DC
1,4 W (GSR EMR2 = 2,8 W)
100 % ED
approx. 25 - 65 Nm at an opening
angle of 90° (dependent upon the
strength setting of the door
closer).
max. 130°
2
. The PE
1)
➀ RMZ smoke detector
➁ Electro-magnetic hold-open device
➂ RM smoke detector
➃ DORMA HT manual release pushbutton for hold-
open devices (optional).
This pushbutton must not be concealed by the
door when in its hold-open position.
a
Installation arrangement of the RMZ lintel-mounted
smoke detector for applications where the bottom
surface of the ceiling is less than 1 m above the
bottom edge of the lintel on one or both sides of the
☞
door.
1) 1) 1) 1) 1)
See separate sheet for associated connection
diagrams.
b
If the bottom surface of the ceiling is more than 1 m
above the bottom edge of the lintel on one or both
sides of the door, two ceiling-mounted smoke
detectors must be installed in addition to the lintel-
☞
mounted detector.
See separate sheet for associated connection
diagrams.
The slide channels are non-handed, i.e. suitable for
LH and RH doors.
The following describes the fixing process for a left-
handed (ISO 6) active leaf. The procedure for a right-
handed (ISO 5) active leaf should be adapted
accordingly.
Drill all the fixing holes for the closer, slide channel
1
and base unit.
Drill holes for the 10 mm dia. 230 V AC power feed
2
cable by others and for 8 mm dia. cabling for
connection of any ceiling-mounted smoke detectors
and manual pushbuttons.
Fix inactive leaf slide channel.
3
Lead EMF cable from inactive leaf and cable supplied
4
for connecting the RMZ through/in behind the base
unit, using the clips in the base unit to hold both
cables in place
.
Lead all other cables through the base unit
base unit in place
ready for mounting the RMZ.
Secure cables to frame to prevent damage during the
installation work
.
5
Fix active leaf slide channel.
Fit the closer body and arm in accordance with the
TS 93 B fixing instructions, and adjust both door
closers as required.
6
Measure dimension X
Shorten connecting rod
7
X-47 (TS 93 EN2-5)
X-43 (TS 93 EN 5-7).
7
Open both door leaves
Ensure that the adjustment sleeve has been fully
wound in
.
Insert the connecting rod into the adjustment sleeve
of the active leaf slide channel
the plastic slider of the inactive leaf slide channel
Guidelines for hold-open systems issued by the Institute for Building Technology,
1 )
1 )
1 )
1 )
1 )
Berlin. In countries outside Germany, consult local regulations.
☞
1) 1) 1) 1) 1)
1) 1) 1) 1) 1)
and fix
.
to
.
, and then place in
.