Noise Emission; Content Of Delivery; Transport And Installation - Jet JDP-10M Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.2 Noise emission

Acoustic pressure level (EN 11202):
Idling
In operation
The specified values are emission
levels and are not necessarily to be
seen as safe operating levels.
As workplace conditions vary, this
information is intended to allow the
user to make a better estimation of the
hazards and risks involved only.

4.3 Content of delivery

Machine base
Column and bracket assembly
Head assembly
Table
Table bracket lock handle
Table bracket rising handle
3 downfeed handles
16mm keyless chuck
MT-2 arbor
Chuck guard
Drift key
Operating tools
Assembly kit
Operating manual
Spare parts list.
5. Transport and start up

5.1 Transport and installation

The machine is designed to operate in
closed rooms and must be placed
stable on a firm and levelled table
surface. The machine can be bolted
down if required.
For packing reasons the machine is
not completely assembled.
5.2 Assembly
If you notice transport damage while
unpacking, notify your supplier
immediately. Do not operate the
machine!
Dispose of the packing in an
environmentally friendly manner.
Clean all rust protected surfaces with
a mild solvent.
Attach the column assembly (A, Fig.
1) to the base (B, Fig. 1) with four hex
cap bolts (C, Fig. 1).
Tighten firmly.
69,6 dB (A)
79 dB (A)
Thread the table bracket lock handle
(A, Fig. 2) into the table bracket (B,
Fig. 2).
Slide the table bracket rising handle
(B, Fig 3) onto the table bracket shaft.
Turn the handle until the set screw is
opposite the flat section on the shaft
and tighten the set screw (A, Fig 3).
Insert the table into the table bracket.
Tighten the table lock handle.
Fig 1
Fig 2
Fig 3
5
With the aid of a second person,
carefully lift the head onto the column
top.
Caution: The head assembly is
heavy! Use care when lifting onto
the column!
Rotate the head assembly until the
sides of the belt cover are parallel with
the sides of the base.
Tighten two set screws (A, Fig. 4).
Fig 4
Install three down feed handles (A,
Fig. 5) into the down feed hub (B, Fig.
5).
Fig 5
Install the chuck guard before you
install the drill chuck.
Tighten the clamping screw (A, Fig 6).
Fig 6

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Jdp-13m

Table des Matières