Connect Power - MyQ LiftMaster CAPAC Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INTRODUCTION

Connect Power

INTRODUCTION
To reduce the risk of SEVERE INJURY or DEATH:
• Disconnect power at the fuse box BEFORE proceeding.
• To AVOID damaging gas, power or other underground utility
lines, contact underground utility locating companies BEFORE
digging.
• ALL electrical connections MUST be made by a qualified
INTRODUCTION
individual.
• ALL power and control wiring MUST be run in separate
conduit.
• ANY maintenance to the CAPAC or in the area near the CAPAC
MUST NOT be performed until disconnecting the electrical
power. Upon completion of maintenance the area MUST be
cleared and secured, at that time the unit may be returned to
service.
• CAPAC MUST be properly grounded and connected in
accordance with national and local electrical codes. NOTE:
The CAPAC should be on a separate fused line of adequate
capacity.
Connect 12VDC (7.5 W minimum) power supply to the Power input
connector.
OR
Connect power via power supply connector port.
NOTE: In UL installations the CAPAC shall be powered from the
power limited output of a UL 294 Listed power supply, a UL 603
Listed power supply, a UL 294 Listed access control unit or a UL
325 gate operator.
GATE
SDA SCL
PRE-INSTALL
PRE-INSTALL
PRE-INSTALL
OUTPUT
WIEGAND
INPUT
1
OUTPUT
2
1
WIEGAND
NO COM NC
NO COM NC
D1 COM D0
Terminal Block Power
12-24VDC
See the Electrical Specifications table
for detailed power requirements.
INSTALL
INSTALL
• All power wiring should be on a dedicated circuit and well
protected. The location of the power disconnect should be
visible and clearly labeled.
To protect against fire and electrocution:
• Disconnect power BEFORE installing or servicing CAPAC.
• NEVER connect a keypad/reader or lock to doors without first
INSTALL
consulting the applicable fire code.
• You MUST consult with, and get approval from, local fire
officials BEFORE installing locks or devices on ANY doors that
may be fire exits.
• Use of egress push buttons may not be legal. Single action
exits may be required.
• ALWAYS obtain proper permits and approvals in writing
BEFORE installing equipment.
• DO NOT connect the power supply to a switched outlet or
otherwise controlled AC outlet.
• DO NOT connect the power supply to the 120 Vac outlet until
ALL wiring is completed.
2
INPUT
POWER
D1 COM D0
1 GND 2
GND 12V-24V
OR
10
NETWORK
ACCESS CONTROL
NETWORK
ACCESS CONTROL
NETWORK
ACCESS CONTROL
POWER
ETHERNET
AC/DC Power Supply
6-24VDC

Publicité

Table des Matières
loading

Table des Matières