Factory Built Chimney - NECTRE Vermont Bun Baker Manuel D'instructions Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

Factory Built Chimney

When a metal prefabricated
chimney is used, the
manufacturer's installation
instructions must be followed. You
must also purchase (from the same
manufacturer) and install the ceiling
support package or wall pass-
through and "T" section package,
Figure 6
Factory built chimney requirements
Maintain 1"
Clearance
Listed Chimney
Ceiling Support
Listed
Chimney
Floor
Protector
Listed Cap
Storm Collar
Flashing
Combustible
wall
firestops (where needed), insulation
shield, roof flashing, chimney cap,
etc. Maintain proper clearance to
the structure as recommended by
the manufacturer. The chimney
must be the required height above
the roof or other obstructions for
safety and proper draft operation.
See below for chimney termination
requirements.
Listed Chimney
Combustible
Ceiling
Joists
Chimney
Connector
To Stove
* Refer to
Clearances to
Combustibles
Attic Insulation
Shield
Specified
Clearance
Ceiling
Support
11

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour NECTRE Vermont Bun Baker

Ce manuel est également adapté pour:

N350Bb0350

Table des Matières