Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ENGLISH
DESCRIPTION:
1. GLASS COVER: tempered glass to keep water from penetrating the housing and protect the LED-cluster
inside. Should be replace immediately when broken!
2. LED CLUSTER: LED light source size depends on the power of the unit: 10W, 30W, 50W or 80W
3. HEATSINK: passive cooling of the LED + power supply, make sure the heat sink is never covered. Cool
air ventilation makes sure that the projector will last longer.
4. BRACKET: Bracket with 3 holes to fix the projector against a wall, ceiling or to the ground. Also a suitable
mounting hook can be used to hang the projector in truss. After fixing the bracket, point the projector in the
right direction and fasten well.
5. POWER SUPPLY: compartment containing the switching power supply. Make sure it's always well closed
to protect the electronics from water infiltration.
6. MAINS CABLE: 3x 1.0mm² power cable with loose ends for fixed installation.

OVERHEAD RIGGING

 Important: The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials
should be used, the installed device should be inspected regularly for safety.
 Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
 Locate the fixture in a well ventilated spot, far away from any flammable materials and/or liquids. The
fixture must be fixed at least 50cm from surrounding walls.
 The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
 Before rigging make sure that the installation area can hold a minimum point load of 10times the device's
weight.
 Always use a certified safety cable that can hold 12times the weight of the device when installing the unit.
This secondary safety attachment should be installed in a way that no part of the installation can drop
more than 20cm if the main attachment fails.
 The device should be well fixed; a free-swinging mounting is dangerous and may not be considered!
 Don't cover any ventilation openings as this may result in overheating.
 The operator has to make sure that the safety-relating and machine-technical installations are approved by
an expert before using them for the first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.
BRITEQ
®
3/27
OPERATION MANUAL
LDP-FLOODxx-WW

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ldpflood10-wwLdpflood30-wwLdpflood50-wwLdpflood80-ww

Table des Matières