1 Indicator lamp (green)
2 Power switch
3 Gear motor
4 Wasserausgang G 1/2"
5 High-pressure connection M22x1.5
6 Switch lever
7 Screw connections
8 Hole cone
9 Support pipe
Device elements
10 Cleaning head
11 Connection for suction pipe
12 Suction tube 550 mm
13 Suction tube 350 mm
14 Suction tube 300 mm (for bendable
tube)
15 Bendable tube
16 Bracket
17 Nozzle set
2
-
EN
18 Power supply
19 Extension cable (10 m)
20 High pressure hose (1.5 m)
A SPRAY position (spray and vacuum op-
eration)
B SUCTION position (vacuum operation)
9