3. Remove drip pan and disassemble two 10-24 bolts, one to the left and one to the right of the
inside drip pan area, behind the top section front frame (Fig. 2).
4. Carefully remove broiler top section from the bottom section.
5. Leaving the lower far-left and right holes open, reassemble the top finishing back onto the top.
Broilers Shipped in Two Pieces for Restacking
The incorporation of the stacking straps will eliminate the use of the two oval slots, one to the left and
one to the right, behind the finishing back of the top section. (See Step 2 under Broilers Shipped Pre-
Stacked.)
1. Position broilers as near to installation location
as possible. Remember to allow enough room to
complete stacking procedures.
2. Carefully lift top section and rest it evenly onto
the bottom section.
3. Remove top section drip pan. Align two holes,
one to the left and one to the right of the upper
drip pan area, behind the broiler front frame.
Insert two 10-24 bolts and assemble the top
section to the bottom section.
4. Replace the drip pan.
5. From rear of broiler, remove two 10-24 bolts from
the upper corner of the left- and right-hand bottom
section finishing back.
6. Using four 10-24 bolts, assemble the stacking
strap as shown in Fig. 3. This will complete the
stacking procedure.
Fig. 1
PL-41717
– 7 –
Fig. 2
STACKING STRAP
PL-56559
Fig. 3
PL-41718