Vulcan GHCB40C Manuel D'installation Et D'utilisation page 4

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION, OPERATION AND CARE OF
CERAMIC AND SUNGLOW HEAVY DUTY BROILERS
PLEASE KEEP THIS MANUAL FOR FUTURE USE
The manufacturer suggests that you thoroughly read this entire manual and carefully follow all of the
instructions provided.
Your Vulcan Sunglow or Ceramic Broiler is produced with quality workmanship and material. Proper
installation, usage and maintenance of your broiler will result in many years of satisfactory performance.
UNPACKING - ALL BROILER MODELS
This broiler was inspected before leaving the factory. The transportation company assumes full
responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check
for possible shipping damage. If the broiler is found to be damaged, save the packaging material and
contact the carrier within 15 days of delivery.
Remove the small wood slats and wire used to hold burners and broiler grid in place.
Before installing, verify that the electrical service and type of gas supply (natural or propane) agree with
the specifications on the rating plate.
Models
IR2 & GHIR44
GHCB44
HCB2
GHCB40
If the supply and equipment requirements do not agree, do not proceed with the installation. Contact
your dealer or Vulcan-Hart immediately.
GENERAL
INSTALLATION
Rating Plate Location
Cabinet bottom, front right-hand side
Inside cabinet door panel
Cabinet bottom, front left-hand side
Oven: behind the kick panel attached to the left side of the oven
burner box front shield, positioned behind the bell crank
Broiler: Front manifold cover
– 4 –

Publicité

Table des Matières
loading

Table des Matières