Télécharger Imprimer la page

Installation Instructions; Data Plate For Electric Heated Deepfat Fryers; Laws, Regulations And Technical Directives; Installation Place - Diamond F14E/M Instructions Pour L'installation, L'emploi Et L'entretien

Publicité

Les langues disponibles
  • FR

Les langues disponibles

2.
Installation must be performed by qualified technicians according to the law in force.
WARNINGS:
Before proceeding with the installation, remove the protective plastic film from the relevant parts, eliminating any adhesive
residues with an appropriate cleaning product suitable for stainless steel.
2.1

DATA PLATE FOR ELECTRIC HEATED DEEPFAT FRYERS

The technical data plate is located as
follows:
a)in the appliances with cabinet, on same
cabinet at low left and inside;
b)in appliances with no cabinet, at back
and on the side.
2.2

LAWS, REGULATIONS AND TECHNICAL DIRECTIVES

The following indications should be observed during installation:
- Accident and fire regulations in force
- The regulations of the electric power supply company.
- Hygienic regulations.
- The rules for electrical systems.
2.3

INSTALLATION PLACE

- The unit should be installed in adequately ventilated places.
- Install the unit in compliance with the safety regulations.
2.4

POSITIONING

- It is suggested to put the fryer on a stiff, washable and fat-absorbing proof surface.
2.5

ELECTRICAL CONNECTION

Electrical connection should be performed in compliance with the IEC regulations, only by authorised and competent
personnel. In the first instance, examine the data shown on the technical data table of this manual, on the serial plate and on
the electrical diagram.
The envisaged connection is of the fixed type.
IMPORTANT: Ahead of each unit it is necessary to install an omnipolar main breaker, having a spacing among contacts of
at least 3mm; example:
- manual breaker of appropriate capacity, complete with fuse valves
- automatic breaker with respective magnetothermal relays.
The terminal board is placed inside the head. to reah it, unscreu the screws of the back cover.
2.5.1

EARTHING

It is essential to earth the unit.
To this purpose, it is necessary to connect to an efficient earthing system the terminals marked with the symbols (
on the line-receiving terminal box. The earthing system should comply with the law in force.

INSTALLATION INSTRUCTIONS

V
KW
- 12 -
Mod.
Matr. N°
HZ
) placed

Publicité

loading

Ce manuel est également adapté pour:

F14+14e/mF14/em