Installation
Install the heater as per installation instructions
supplied with it.
Finish the wall at sides up to the black frame on heater.
Finish the wall 1 inch (25 mm) above the top of the black
frame on heater. Ensure that the wall finish is flush or
slightly in front of the black frame. Allow for height of
finished hearth or the backing plate will not install.
If the wall above the heater is finished to the black
frame, the wall finish must be cut 1 inch (25 mm) to
allow the fitting of the backing plate.
Alternatively, if the wall finish is non-combustible,
the flange on the top rear of the backing plate can be
broken off the plate to allow the finish behind the plate.
1. Install the backing plate to the heater fixing it with
4 screws provided. The position of the plate can be
adjusted front to back to accommodate the wall
finish thickness.
2. Slide in and place the heat exchanger cover as
indicated. The bottom tabs cover the ports.
Heat Exchanger Cover
2
Heat Exchanger
3. Remove the existing baffle supplied on the heater
(3 screws). Fit and secure the convection heat baffle
supplied to the heater (3 screws). You may need to
remove the window to gain space for a screwdriver.
Check the appliance manual for window removal
instructions.
Slide the baffle in or out so that its first bend lines
up with the front face of the backing plate.
3-Sided
Frame
Convection heat baffle
position—
right side section view
4. Re-install the window if you have removed it. Follow
the procedure supplied in the appliance manual.
5. Fit the side shrouds to the heater by first sliding
them up beside the convection baffle and then
hooking the tabs down to the heater frame.
1
1
2
Backing Plate
Heat Baffle
2
1
2