Equipment; Basic Equipment; Accessories; Assembly Of The Systems - zarges Z600 Notice De Montage Et D'utilisation

Equipements modulaires pour líindustrie
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4.3

Equipment

4.3.1

Basic equipment

Industrial access steps with guard rails
• 1 stairway with ground brackets and wall fastening
brackets
• 1 or 2 step guard rails
• 1 set of attachments
Platform steps with guard rail and supporting shanks (option-
al)
• 1 stairway with ground brackets
• 1 platform with wall fastening brackets
• 1 or 2 guard rails
• 1 or 2 platform side guard rails
• 1 supporting shank (optional)
• 1 set of attachments
Stationary bridging steps
• 2 stairway with ground brackets
• 1 platform
• 2 or 4 step guard rails
• 1 or 2 platform side guard rails
• 2 connecting struts
• 1 set of attachments
Working platforms, module system
• 1 platform
• 2 supporting shanks with ground brackets
• 2 side guard rails
• 1 or 2 front guard rails
• 1 set of attachments
4.3.2

Accessories

Industrial access steps with guard rail
• Support hooks
• Supports
• Snap-in bracket
• Plug-in guard rail
Platform steps with guard rail and supporting shanks (option-
al)
• Support hooks
• Supports
• Platform guard rail, front
• Triangular brackets
• Double barrier
• Locking chain
• Snap-in bracket
• Hinged door
• Plug-in guard rail
Stationary bridging steps
• Double barrier
• Locking chain
• Plug-in guard rail
Working platforms, module system
• Plug-in guard rail
• Double barrier
• Hinged door
o
N
291311
5

ASSEMBLY OF THE SYSTEMS

5.1

Safety rules

• The systems should be set up at right angles and on a
base that has adequate load supporting capacity.
• Only undamaged and fault-free geniune parts of the
systems of the manufacturer should be used.
• Only self-locking nuts should be used during assem-
bly or repair.
• Self-locking nuts should be used only once.
• The assembly should be performed only by trained
staff.
Trained staff means staff having technical skilled
worker training, who are in a position to execute as-
sembly and repair jobs in their corresponding techni-
cal area.
• Guard rails are to be attached from a platform height
of >500 mm.
• After the assembly, the total system must be checked
for proper installation.
• After the assembly, please check that all nuts and
screws are tight. When tightening screw fasteners,
use a torque wrench. The tightening torques are giv-
en in description of the assembly.
• Wall fastening brackets and ground brackets must be
mounted with technically approved dowels. The as-
sembler is responsible for the fitting and installation
and has to check the anchoring base thoroughly for
suitability. For further information, consult a struc-
tural framework expert or a consultant of the dowel
manufacturer. Dowels are not included in the deliv-
ery.
• For mounting the constuctions, the works listed be-
low for central pull, transverse pull and oblique pull
must be accepted under each angle and mounting
point.
Industrial access steps
Platform steps
Bridging Steps
Working platforms, module systems
- 21 -
> 3.50 kN
> 4.00 kN
> 4.00 kN
> 4.00 kN
GB

Publicité

Table des Matières
loading

Table des Matières