Kobalt SGY-CMI Mode D'emploi page 8

Masquer les pouces Voir aussi pour SGY-CMI:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY INSTRUCTIONS
5. Assemble wheels (B) to mixer frame using shoulder bolt
(CC), M10 flat washer (BB) and M10 nut (AA).
Tighten wheel bolts.
Set mixer frame on level surface. Make sure cross member (E)
is steadily seated on the ground.
Slide end cap (II) onto rear leg cross member (E).
MAKE SURE ALL SCREW HOLES AND SCREWS ALIGN
PROPERLY. PROPERLY TIGHTEN ALL SCREWS USED IN
STEPS 1 - 5.
HARDWARE USED
2
AA
M10 Nut
M10 Flat
BB
2
Washer
CC
2
Shoulder Bolt
II
End Cap
2
6. Attach drum support arm (G) to handle (F) using
M8 × 40 mm bolt (DD) and M8 Nut (HH).
Assemble dump handle (J) to drum support arm (G)
using two M8 × 45 mm bolts (EE) and two M8
nuts (HH).
DO NOT COMPLETELY TIGHTEN.
HARDWARE USED
M8 × 40mm Bolt
DD
1
M8 × 45mm Bolt
EE
2
HH
M8 Nut
3
7. Assemble motor (N) to handle (F) and drum support
arm (G) using M6 nut (NN), M6 spring washer (PP)
and M6 flat washer (OO).
After aligning all holes from motor housing to drum support
arms properly, tighten all screws from motor housing to mixer
arm supports securely.
TIGHTEN ALL FASTENERS FROM STEPS 6 & 7.
HARDWARE USED
4
NN
M6 Nut
M6 Flat
OO
4
Washer
M6 Spring
PP
4
Washer
8. Assemble U-Bolt (KK) to drum support arm (G) using
two M8 nuts (HH). Do not completely tighten.
Slide onto pivot pin (L).
Insert U-Bolt (KK) into handle (F). Attach two
M8 flange nuts (HH) to U-Bolt.
TIGHTEN ALL SCREWS.
HARDWARE USED
KK
2
M8 U-Bolt
M8 Nut
HH
4
8

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

0241568

Table des Matières