New Construction; Gyproc Installation - sistem air FLEXIN Guide D'installation

Premier
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

New construction

Gyproc Installation

1
2
3
Attach the frame of the inlet to the stud (2x4) .
Make sure that the inlet is leveled (fi gure 1) and that
you leave 8 cm free behind the inlet.
We recommend to add another stud on the other
side to secure the inlet in place (fi gure 2).
Install the pipe into the fi tting (fi gure 3). Glue the
pipe into the fi tting, making sure it seats all the way
to the ridge of the pipe fi tting.
ENG
19

Publicité

Table des Matières
loading

Table des Matières