Plan The Installation; Hose Lengths; Power Unit Selection; Valve Locations - sistem air FLEXIN Guide D'installation

Premier
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Plan the installation

Planning is the key of a successful installation of a central vacuum system. A
balance between the best locations for the inlet valves and the practicality of
installing in these locations is essential. With a little ingenuity, most locations can
be reached.

Hose lengths

Let customers know that you will custom the hose size to fi t each fl oor. Hose kits
come in 9 m, 12 m or 15 m lengths.

Power Unit Selection

It is important to keep in mind that air fl ow is reduced with longer hoses. To com-
pensate for the loss of air fl ow, a larger power unit is required.

Valve locations

A 50' (15.2 m) hose will usually cover between 170-220 m

Plan pipe runs

Carefully read the "pipe runs" section of this guide. There is also a diagram of four
typical pipe runs.

Rough In

(measurements in mm)
182
143
2
.
Max
48
25
9.5
Min
98
14
ENG
17

Publicité

Table des Matières
loading

Table des Matières