Bertazzoni KTI XT Serie Instructions D'installation Et D'utilisation page 13

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Put a thick, protective covering over cooktop,
2
set-in range or countertop to protect from damage or dirt.
Determine and clearly mark with a pencil on the ceiling where the rangehood will
be installed.
A template 21 for mounting the support is supplied in the carton with the support.
Use this template to mark holes for
support on the ceiling.
Determine and make necessary cuts for the ductwork. The duct opening is shown
on the mounting template. Install
ductwork before mounting the hood.
Determine the proper location for the Power Supply Cable as indicated on the
template. Use a 1 1/4" Drill Bit to make this hole. Run the Power Supply Cable.
Use caulking to seal around the hole.
A knockout for threading through the Power Supply from the ceiling is located on
the top of the frame. Do not connect the Power Cable to the Wiring Box or power
up the hood at this time. Run enough power cable from the ceiling to reach the
wiring box on the hood.
21
1
"
Ø 10 mm
1/4
x4
13

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Kti42xtKti48xtKti36xt

Table des Matières