Before Operation - EINHELL BT-HD 14,4 Li Mode D'emploi D'origine

Masquer les pouces Voir aussi pour BT-HD 14,4 Li:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
Anleitung_BT_HD_14_4_Li_SPK7:_
L
Sound pressure level,
pA
K
Uncertainty
pA
L
sound power level
WA
K
Uncertainty
WA
Wear ear-muffs.
The impact of noise can cause damage to hearing.
Total vibration values (vector sum of three directions)
determined in accordance with EN 60745.
Hammer drilling concrete
Vibration emission value ah a
= 7,909 m/s²
h
K uncertainty = 1.5 m/s
2
Additional information for electric power tools
Warning!
The specified vibration value was established in
accordance with a standardized testing method. It
may change according to how the electric equipment
is used and may exceed the specified value in
exceptional circumstances.
The specified vibration value can be used to compare
the equipment with other electric power tools.
The specified vibration value can be used for initial
assessment of a harmful effect.
Keep the noise emissions and vibrations to a
minimum.
Only use appliances which are in perfect working
order.
Service and clean the appliance regularly.
Adapt your working style to suit the appliance.
Do not overload the appliance.
Have the appliance serviced whenever
necessary.
Switch the appliance off when it is not in use.
Wear protective gloves.
Residual risks
Even if you use this electric power tool in
accordance with instructions, certain residual
risks cannot be rules out. The following hazards
may arise in connection with the equipment's
construction and layout:
1. Lung damage if no suitable protective dust mask
is used.
2. Damage to hearing if no suitable ear protection is
used.
3. Health damage caused by hand-arm vibrations if
the equipment is used over a prolonged period or
is not properly guided and maintained.
22.08.2011
15:14 Uhr
87 dB(A)

5. Before operation

3 dB
Be sure to read the following information before you
98 dB(A)
use your cordless hammer drill for the first time:
3 dB
1. Charge the battery pack with the charger
supplied. An empty battery pack requires a
charging period of approximately 3 hours.
2. Only sufficiently sharpened drills and drill bits,
which are in perfect working order, should be
used.
3. When screwing into walls or partitions, test these
for electrical, gas or water mains.
6. Operation
6.1 Charging the LI battery pack (Fig. 2-3)
The battery is protected from exhaustive discharge.
An integrated protective circuit automatically switches
off the appliance when the battery is flat. In this case
the bit chuck will cease to turn.
Warning! Do not press the ON/OFF switch any more
if the protective circuit has actuated. This may
damage the battery.
1. Remove the battery pack (8) from the handle,
pressing the pushlock buttons (10) downwards to
do so.
2. Check that your mains voltage is the same as that
marked on the rating plate of the battery charger.
Plug the battery charger in the plug socket and
connect the charging cable to the charging
connection. The charging process starts as soon
as the charging cable is connected to the
charging adapter.
3. If the green LED (a) flashes, the battery is being
charged.
4. After successful charging, the LED light is green
(a)
If the battery pack fails to charge, please check
whether there is voltage at the socket-outlet.
for proper contact with the charging contacts in
the battery charger.
If the battery pack still fails to charge, send
the battery charger
and the battery pack
to our customer services department.
To ensure that the LI battery pack provides long
service you should take care to recharge it promptly.
You must recharge the battery pack when you notice
that the power of the cordless hammer drill drops.
Seite 11
GB
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

45.134.8111011

Table des Matières