Finalize Installation; Installation Checklist; When All Hookups Are Completed - GE ZGP364NDNSS Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

13
ADJUSTING THE BAKE BURNER
AT SHUTTER (cont.)
After confirming correct burner operation, replace
all parts.
14
CHECK OPERATION OF OVEN
BROIL BURNER
The broil burner must be on and warmed up for 3
min. prior to checking operation.
the entire surface of the screen that is blue and
present.
If the flame is long and
lazy, verify the proper
orifice is installed and
the regulator is converted
properly for your gas
supply.
WHEN ALL HOOKUPS ARE
COMPLETED
appliance once the appliance has been turned on and
31-11125-2
Installation

FINALIZE INSTALLATION

INSTALLATION CHECKLIST

to the range is unobstructed.
Recheck Steps:
Double check to make sure everything in this
manual has been completed. Rechecking steps
will ensure safe use of the range.
NOTE: The rating plate is located on the bottom of

Publicité

Table des Matières
loading

Table des Matières