Wall Mounted Winch >ALPHA<
English
300 – 500 – 750 – 1000 kg
Before taking into operation, please carefully
read this operating instructions!
Observe the safety instructions!
File documentation!
Destined use
The wall mounted winch >ALPHA< is a manually
operated winch fixed to the wall for lifting and
lowering of loads.
Not suitable for use in explosive danger area.
Not suitable for use in corrosive atmosphere
Power operation is not allowed.
The winch is not designed for continuous
operation.
Alterations to the winch or fitting of accessories
are only allowed with our written approval.
Pay attention to the technical data and functional
description!
Regulations for the Prevention of
Accidents
Observe any rules which are valid for the respec-
1)
tive country.
Presently valid in Germany:
UVV VBG 8 (BGV D8)
winches- lifting and pulling devices
UVV VBG 9a
load suspension devices in hoist operation
DIN 15020 page 1 and page 2
EC directive 98/37/EC
FEM 9.661 ISO 4308/1
1) in the respective version
Safety Instructions
Operation, installation and maintenance work
should only be executed by personnel who are:
• competent
• trained
• familiar with the relevant regulations
Do not grease or lubricate the brake mechanism.
Moving of people by the winch or of loads over
people is strictly forbidden.
Never touch moving parts.
Defects must be repaired immediately by compe-
tent trained personnel.
design changes under reserve
4.4.13
The load
• must not be left suspended without supervision,
• must not be allowed to swing
• must not fall into the wire rope
The rope
• should only be used for lifting, lowering or pull-
ing of various loads and must not be used for
any other purpose.
• lowerst position at least 3 full turns of rope
should remain on the drum when loaded.
!
• max. fleet angle 3° (see picture)
• when filled to its capacity the drum flanges must
project not less than 1.5 times the diameter of
the rope.
• examine and service regularly according to
DIN 15020 page 2
• only handle with safety gloves
• do not touch the rope inlet
The Winch
Do not exceed the capacity of each rope layer.
Before taking into operation, a competent person
must check:
• the lifting device
• the load bearing parts of the structure
• the carrying medium
•
mounting
Daily examinations:
• brake functions
• condition of the rope and loading device
• load bearing parts of the structure.
• the load carrying medium
3. 2. 1.
page 7