F 110 NT
Oil/Gas-fired special cast
heating boiler
Installation manual
C ontents
1.
Description
2.
Regulations
3.
Delivery format
3.1
Accessories
4.
Overview
5.
6.
7.
7.1
7.2
7.3
7.4
7.5
8.
8.1
8.2
8.3
8.4
8.5
9.
10.
10.1
10.2
11.
Care and servicing
11.1
Oil/Gas-fired special cast sectional-construction heating
boiler. Combustion chamber follows flame reverse princi-
ple and optimum interspersed heat surfaces ensure the
best heat transmission and the most efficient use of flue
heat. As a low-temperature boiler, it complies with the
regulations concerning heating installations. Boiler clea-
ning is carried out from the front and is easily accomplished
by swinging open the burner door. This product is exempt
from the rules relating to drought measures.
2. Regulations
The boiler possesses the CE stamp and is therefore ap-
proved for use and installation within the area of the EU
internal market. When installing and setting up the system,
observe the regulations relating to construction, industry,
emissions, and water q uality, referring - among others - to
the following:
DIN 4751 parts 1+2 Safety eq uipment for hot water heating
systems with advance temperatures of up to 120° C.
DIN 1988 Drinking water mains on private land, technical
conditions for construction and use.
Boiler room guidelines or local regulations (FeuVo)
HeizAnIV heating systems regulation
HeizBetrV heating systems regulations and req uirements
and rules of building inspection authorities or possibly
industrial control department. The installation of boiler units
with a heating capacity in excess of 50 kW is to be dealt
with by the competent permission-issuing authorities in
compliance with §12, section 2 of the rules concerning
steam boilers. Form III is to be used in this case.
9
Both selection of the installation format and measures
9
relating to boiler room ventilation and exhaust are to be
9
agreed with the local building inspection authorities, usu-
9
ally via the body regulating the activity of industrial chimney
10
sweeps.
11
11
12
12
3. Delivery format
12
F 110/3 NT, F 110/4 NT, F 110/4.1 NT:
12
Cast block and insulation jacket supplied completely as-
12
sembled and delivered on wooden pallet.
12
F 110/5 NT, F 110/5.1 NT, F 110/6 NT, F 110/6.1 NT: cast
block without packing, insulation jacket packed in cardbo -
12
ard box.
13
13
3.1 Accessories
14
14
- Control panel SP 1.1 for operation with single-stage
burner and for a heating system with a maximum of one
14
radiator circuit and one process water circuit.
15
- rapidomatic heating circuit control for SP 1.2:
15
rapidomatic Z 2.3 SM, Z 3.3 SM, 3 SM, 2 SM, S, RTU
15
room dial thermostat
15
- SP 110 control panel
15
- Oil-jet burner BF 100
16
- Noise insulation cover
11