Commissioning; Installation Of Width Adjustment; Hand Lever Assembly - hawa 2677 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operating instructions Wiring Duct Cutter

5. Commissioning

For transport reasons, the wiring duct cutter can only be delivered preassembled.
Assembly and putting into operation instructions:
5.1 Installation of witdh adjustment
Screw the handle (3) into the front of the slide block.
Fig.1
5.2 Hand lever assembly (fig. 2)
Remove transport safety device (1). Insert hand lever (2) from the top into the wiring duct cutter and secure it with the attached 2 screws and allan key,
access through the holes in the side plates.
Attention: Tighten the screws completely, otherwise the lever path will be blocked.
Fig. 2
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

2677-0100-01-00

Table des Matières