Installation Instructions - GE RAB24 Instructions D'installation

Gaine d'acier standard pour climatiseurs 24 po à travers mur
Masquer les pouces Voir aussi pour RAB24:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 1: Preparation of the wall
and lintels should be used to support the block above
the wall case. The case will not support the concrete
Main stud
Jack studs
25 " Min.
15 " Min.
Cripple
Jack studs
Finished
r
NOTE:
use of a lintel may not be necessary.)
Dimensions*
Width
MOUNTING
BRACKETS (4)

Installation Instructions

Header - 4" x 4" r
tw
e
Adjust framing
t
ure this
dime
n
"D"*
( *See chart
e 1)
r
Case Dimensions
Width
Depth
WEATHER
BARRIER
PUSH PINS (4)
PLASTIC HOLE
PLUGS (4)
No. 10A X
"
SLOTTED HEX
SCREWS (4)
STEP 2: Assemble Case
panel slot. Fully Insert the left panel into the bottom
panel until all tabs lock completely.
5. (If required) Locate weather barrier and attach to the
rear of the assembled sleeve with four (4) supplied
white push pins.
2
2
Front View
Front View
Front View
Front View
1
3
Weather Barrier
4
Rear View

Publicité

Table des Matières
loading

Table des Matières