Installing The Zoneline; Installation Summary; Installation Instructions - GE Zoneline AZ95E Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing the Zoneline

locations.
7. Connect the top ductwork.
8. Connect the remote thermostat.
1. Plan for proper electrical supply, drains and ductwork locations.
2. Install the Wall Plenum and Louver
Refer to instructions included in the wall plenum kit RAVWPT15 for proper installation procedures.
3. Install the Zoneline Drain Platform
1.
2. Place the platform in the utility closet with the following clearance between it and the interior surface of the
walls/door/panel:
3. Complete rough in plumbing for primary and secondary condensation drains.
Condensate Disposal System
condensate onto the hot outdoor coil.
NOTE: If the condensate disposal system fails to remove all of the condensate from the unit, any
excess condensate will overflow from the drain pan into the secondary drain (if connected), and drain
outside the building. This is your indication that the chassis or drain requires servicing.

INSTALLATION SUMMARY

INSTALLATION INSTRUCTIONS

49-5000561 Rev. 1

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zoneline az95h

Table des Matières