Publicité

Liens rapides

Before you begin - Read these instructions completely
and carefully. IMPORTANT – OBSERVE ALL
GOVERNING CODES AND ORDINANCES. Note to
Installer – Be sure to leave these instructions with the
Consumer. Note to Consumer – Keep these instructions
with your Owner's Manual for future reference.
NOTE: Handle the wall sleeve carefully.
CRITICAL DIMENSIONS
Outside wall
"C"
NOTE: Care should be taken in location of electrical
supply entry in relationship to wall sleeve to ensure
access to power once the unit is installed.
Ceiling
"A"
"B"
Roomside
"D"
RAB26A
Room Air Conditioner
Wall Sleeve for AJ Series
Built-In Models
WALL SLEEVE LOCATION
be located in an outside wall to ensure proper
distribution of conditioned air. It should be located
in a portion of the wall where there is no electrical
obstructions immediately inside or outside.
Dimensions Recommended Installation Clearance
A
B
the room, other support is recommended
C
D
E
INSTALL WALL SLEEVE LEVEL FROM SIDE TO SIDE
AND WITH A SLIGHT TILT FROM FRONT TO REAR
Top of case
Top of wall sleeve
"E"
NOTE: If an internal drain is to be used, install the
wall sleeve level from side to side and level from
front to rear.
31-5000463 Rev. 0 11-19 GEA
Outside wall
"E"

Publicité

Table des Matières
loading

Sommaire des Matières pour GE AJ Serie

  • Page 1 RAB26A Room Air Conditioner Wall Sleeve for AJ Series Built-In Models Before you begin - Read these instructions completely and carefully. IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES. Note to Installer – Be sure to leave these instructions with the Consumer.
  • Page 2: Installation Instructions

    Installation Instructions STEP 1: Preparation of the wall STEP 2: Assemble Wall Sleeve and lintels should be used to support the block above the wall sleeve. The wall sleeve will not support the con- Front View and width: panel until all tabs lock completely. Front View Header - 4”...
  • Page 3 Installation Instructions STEP 3: Preparation of the wall sleeve STEP 4: Installation of the wall sleeve in the wall opening installed, proceed as follows: on each side of the to provide a level installation. itate easy installation of an accessory drain, if desired. (If it applied between the drip rail and wall sleeve.) Install the screws from the outside of the wall sleeve.
  • Page 4 Installation Instructions STEP 6: Installing the Grille material. wall . Steel lintel Caulk* Caulk* Wall Room Case Sleeve cabinet Outdoor Slot Location grille Caulk* Caulk* *NOTE: It is critical to caulk around the perimeter of the wall sleeve on all four sides and on the outside and the roomside visible inside the .
  • Page 5 Installation Instructions Electrical Requirements (230V/208V) Provisions should be made to have the proper electrical outlet a wall receptacle located within the area shown in the table below. Inside MODEL “A” “B” 115V 50” 74” 230/208V 39” 65” Wall Receptacles 120V/115V 15 amp 230V/208V 20 amp “tandem”...
  • Page 6 Instructions d’installation du manchon mural intégré de votre nouveau climatiseur RAB26A de la gamme AJ Avant de commencer - Veuillez lire ces instructions attentivement et en totalité. IMPORTANT – OBSERVEZ TOUS LES CODES ET RÈGLEMENTS EN VIGUEUR. Note à l’installateur – Assurez-vous de laisser ces instructions au consommateur.
  • Page 7: Étape 1: Préparation Du Mur

    Instructions d’installation ÉTAPE 1: Préparation du mur ÉTAPE 2 : Assemblage de la gaine murale 1. Placez le panneau inférieur sur une surface propre, plane et de Il faut installer la gaine murale pendant la construction et utilis- niveau. er des linteaux pour supporter les blocs au-dessus de la gaine Vue de face murale.
  • Page 8: Étape 3 :Préparation Du Manchon Mural

    Instructions d’installation ÉTAPE 3 :Préparation du manchon mural ÉTAPE 3: Installation de la gaine dans l’ouverture murale Si vous devez utiliser des renforts de boitier sur le site, ces derniers doivent être installés comme suit : 1. Placez la gaine dans le mur. Reportez-vous au tableau de 1.
  • Page 9: Étape 5: Étanchéisation

    Instructions d’installation ÉTAPE 5: Étanchéisation ÉTAPE 6: Installation de la grille Étanchéisez les interstices entre les murs extérieur et intérieur 1. Assurez-vous que le bord de la grille est face vers le haut et et la gaine avec du calfeutrage ou un produit d’étanchéisation que les deux (2) languettes sont dirigées vers le haut.
  • Page 10: Trousse De Vidange (En Option)

    Instructions d’installation EXIGENCES ÉLECTRIQUES (230V/208V) Des dispositions doivent être prises pour que la prise électrique appropriée soit à proximité du boîtier. Tout le règlements locaux. Le cordon de ligne fourni avec le châssis (le cas échéant) s’étend à une prise murale située dans la zone indiquée dans le tableau ci-dessous.

Ce manuel est également adapté pour:

Rab26a

Table des Matières