Special Vent Installations; Periscope Termination - Napoleon Havelock GDS50-1NSB Manuel D'installation Et D'opération

Masquer les pouces Voir aussi pour Havelock GDS50-1NSB:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.2

special vent installations

2.2.1 periscope termination

Use the periscope kit to locate the air termination above grade. The periscope must be installed so that when
fi nal grading is completed, the bottom air slot is located a minimum 12" (305mm) above grade. The maximum
allowable vent length (including both rise and run) is 10' (3m) for a fi replace and 8' (2m) for a stove. An insulation
sleeve is illustrated in the top vent image below, use only when supplied with the appliance.
(The insulation sleeve is not required with a stove appliance)
29" (73.7cm)
regardless of horizontal vent length
30 3/4"
(78.1cm)
venting
EN
12" (30.5cm)
Minimum to
Grade
11
W415-2348 / B / 01.22.20

Publicité

Chapitres

Table des Matières
loading

Table des Matières