Télécharger Imprimer la page

Calorex PPT8LX SLIMLINE Manuel D'installation page 12

Publicité

Les langues disponibles

Les langues disponibles

Installation Manual
PPT8/12/16/22LX/LY SLIMLINE
Calorex Heat Pumps Ltd. · The Causeway, Maldon, Essex CM9 4XD, UK
i) When the pipework installation is complete the pool pump should be
switched on and the system tested for leaks. Also check the filter gauge
to see that there is not an excessive increase in back pressure. If
everything is then working normally the water circulating system is ready
for use.
j) Water circuit to and from the unit is to be capable of maintaining within
specified limits the rate of flow required by the heat pump. (See section 9).
k) All pipework must be adequately supported with allowance expansion/
contraction especially with plastic pipework.
l) It is recommended that when installing water systems the last
connections to be made in the system should be breakable connections
to avoid any stresses on the unit connections.
IMPORTANT
1. All Pool Purifying Devices and Chemical Injection Systems to be fitted
down stream of the heat pump (see section 3.1) unless installation is as
per filter dosing. This includes the practice of dosing chemicals direct into
skimmer basket, which results in concentrated corrosive liquids passing
over vulnerable metal components.
2. Water quality must be maintained as follows:
Acidity pH
Total Alkalinity, as CaCO
Total Hardness, as CaCO
Total Dissolved Solids
Maximum Salt Content
Free Chlorine Range
Free Chlorine Range
Superchlorination
Bromine
Baquacil
Ozone
Maximum Copper Content
Aquamatic Ionic Purifier
3. Maximum pressure of water in heat pump circuit should not exceed
2.5bar for PPT8/12 (35 psi) and 3.5bar for PPT16/22 (50 psi).
Page 9
pH
ppm
80 - 120
3
ppm
150 - 250
3
ppm
1000 Max
ppm
35000 Max
ppm
1 - 2 Domestic
ppm
3 - 6 Commercial
max
30ppm for 24 hrs
ppm
ppm
ppm
ppm
ppm
®
7.2 - 7.8
2 - 5
25 - 50
0.9 Max
1
2 Max
SD638150 ISSUE 11

Publicité

loading