First Time Operation - hestan KRG Serie Mode D'emploi

Masquer les pouces Voir aussi pour KRG Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GETTING STARTED WITH YOUR APPLIANCE
SEALED BURNERS
SEALED BURNERS
Ensure the sealed burner heads are properly installed and seated on the burner base as shown below.
There are notches on the burner base and cross ring to help with alignment. The outer burner head
EN
features a long slot on the top of the head which aligns with the spark igniter. Assembly of the
single-flow burner head is similar.
OUTER
BURNER
HEAD
BEAUTY
RING

FIRST TIME OPERATION

FIRST TIME OPERATION
Ensure there are no packaging materials inside the oven. Remove any labels or plastic film from the
outside of the appliance. Before using your oven for the first time, it will be necessary to run a bake
cycle to burn off any manufacturing oils and residues from the oven cavity. This may produce a little
smoke and some odor. This is normal and is typical of any new oven when first used. If the smell
is strong, remove persons and animals from the kitchen during this period. Open any windows to
further vent the odor from the room.
Install all the oven racks. Turn on your vent hood, and run the oven on BAKE at 500°F [260°C] for
1-1/2 hours. Allow to cool completely before attempting to cook.
14
©2020 Hestan Commercial Corporation
INNER
BURNER
HEAD
DUAL FLOW
BURNER
CROSS
RING
BURNER
BASE
SINGLE FLOW
BURNER
(CONTINUED)
BURNER
RING
BURNER
HEAD
BURNER
BASE
IGNITER

Publicité

Chapitres

Table des Matières
loading

Table des Matières