FS DUAL INTEL XEON RS7260 Guide De Démarrage Rapide page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Processor Installation
Pin 1
Pin 1
Processor
Carrier
1. Hold the processor with the land grid array (LGA, gold contacts) facing down. Locate the gold
triangle at the corner of the processor and the corresponding hollowed triangle on the processor
carrier. These triangles indicate the location of pin 1.
2. Using the triangles as a guide, carefully align and place Point A of the processor into Point A of the
carrier. Then gently flex the other side of the carrier for the processor to fit into Point B.
3. Examine all corners to ensure that the processor is firmly attached to the carrier.
11

Publicité

Table des Matières
loading

Produits Connexes pour FS DUAL INTEL XEON RS7260

Table des Matières