Chauvet DJ GEYSER P4 Manuel De Référence page 4

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19
Geyser P4 QRG
AC Power
Fuse
Replacement
Mounting
Mounting
Diagram
FCQ (Fog Cleaner Quart) was specifically developed by
CHAUVET to clean your Geyser P4. Make sure you use FCQ
regularly to increase the life of your product.
This product has fixed-voltage power supply that can work with an
input voltage of either 120 VAC, 50/60 Hz or 230 VAC, 50 Hz.
1. Disconnect the product from power.
2. Wedge the tip of a flat-head screwdriver into the slot of the fuse
holder.
3. Pry the safety cap out of the housing.
4. Remove the blown fuse from the clip on the front of the safety cap
and replace with a fuse of the exact same type and rating.
5. Re-insert the fuse holder and reconnect power.
Before mounting this product, read the Safety Notes.
Overhead Mounting – Downward Fog Output
Floor Mounting – Vertical Fog Output
Note: Remove the fluid tank from the holder and set it upright on
an adjacent surface when mounting the Geyser P4 in an inverted
position to avoid leaking.
Floor Mounting – Horizontal Fog Output
EN

Publicité

Table des Matières
loading

Table des Matières