Multichoice ® Rough-In Installation Instructions - Delta MultiChoice 17 Serie Guide D'utilisation

Masquer les pouces Voir aussi pour MultiChoice 17 Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1
A.
SHUT OFF WATER SUPPLIES.
Consider the type and thickness of your
finished wall before placing your stringer
back plate. Install the body (1) so the
surface of the finished wall is flush with the
front of the plasterguard (2) ± 3/8". Note:
For models with stops (3), plasterguard
B.
Distance (1) from the stringer (2) to the
front of the plasterguard is 2.8" (71 mm).
Distance (3) from the stringer (2) to the
front of the bonnet is 3.9" (99 mm).
MultiChoice
4
6
1
2
5
3
Rough-In Installation
®
3
4
must be flush or subflush 3/8" to
finished wall. Mount body using the two
stringer mounting holes (4) on the bracket.
Note: Remove cover (5) to access
mounting holes. Make sure the word "UP"
(6) is on top of the valve body when
installing.
2
1
3
If a thin wall is used, be sure to have the
plasterguard behind the wall, otherwise the
wall should always be flush with the front of
the plasterguard. See instruction on the bag
for thin wall mounting.

Publicité

Table des Matières
loading

Table des Matières