A
P05425
P6(H1)115ASS16
P6119ASS16
58094
P6720NLASS15
P6019ASS16
P6124ASS16
P6005ASS16
P61322ASS16
P61318ASS16
1
A
P6019ASS16
P6019ASS16
3
A
P61318ASS16
PEDESTAL FIXING
EN60335-2-41 TEST standard requires the filter pump to be
vertically fixed on ground or a certain pedestal made of wood or
concrete before use. There should be two holes 9mm in diameter
on the pedestal, the space between which should be 159mm.
Put filter pump on the pedestal and fix them together by fasten
the bolts and nuts. All the pedestal parts should weigh over
18kgs at least to prevent the pump from accidentally falling.
NOTE: It is important to ensure all elements: Hoses, Debris
Screens and Inlet/Outlet Valves are properly aligned.
OPERATION
1) Open/unscrew the Air Purge Valve on the top of the Filter Pump; air is released as water fills the Filter Pump.
2) When water comes out of the Air Purge Valve screw it closed and wipe away any water.
3) To start the Filter Pump, insert the plug into a residual current device (RCD).
P6(H1)115ASS16
P05425
P6119ASS16
58094
B
P6005ASS16
P6720NLASS15
A
B
1
1
1
1
1
1
1
1
1
1
2
2
4
2
2
2
1
0
1
0
B
B
P61322ASS16
P6019ASS16
A
X2
B
X2
2
A
A
A
B
B
4
A
6
P6124ASS16
P61318ASS16
P61322ASS16
X1
X1
B
A
B
B
P6124ASS16
2-M8 nut
2-M8 bolt