5.5.1 Pressure line with the Kompaktboy 1.1 and 1.5
i
The sewage check valve, which is required according to pertinent regulations, is inte-
grated in the lifting unit Kompaktboy Double 1.1 and 1.5 in the form of two check valves
on the part of the building site.
i
90 (pipe ends
72
The Y-pipe combines the two pressure outlets.
1.
2.
3.
4.
pipeline in DN 100 on the part of the building site (pipe
ends
1.
2.
3.
4.
85 - 90 mm).
Kompaktboy Double
Insert the supplied seal rings (O-Ring DN 100)
into the groove of the pressure outlets of the col-
lecting tank.
Put on the Y-pipe and position it so that the holes
collecting tank.
Hand-tighten the four screws per pressure outlet
M 16 x 60.
Equally tighten the screws crosswise.
108 -116 mm)
Hand-tighten the four screws M 16 x 100.
Equally tighten the screws crosswise.
en English