Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WIRING
Note: This range hood must be properly
grounded. The unit should be installed by a
qualified electrician in accordance with all
applicable national and local electrical codes.
1. Remove the wiring box cover. Remove a
knockout from the wiring box.
2. Secure the conduit to the wiring box
through a conduit connector.
3. Make electrical connections. Connect white
to white, black to black and green to green.
4. Replace wiring box cover and screws. Make
sure that wires are not pinched between
cover and box.

CONNECT DUCTWORK

1. Use 8" round metal duct to connect the
discharge collar on the hood to the ductwork
above.
2. Use duct tape to make all joints secure and
air tight.
3. Remove the two temporary retaining
screws from the lower flue and set it in place
on the hood.
4. Secure decorative flue to hood with two
mounting screws (3,9x9,5mm).
BOTTOM TRIM
REPLACEMENT
1. Remove the four (4) screws from the inside
of the hood.
2. Remove the trim by pulling downward.
3. Slide the new trim upward onto hood.
4. Replace the four screws removed in step
1 above.
WIRING BOX
COVER
LOWER FLUE
8" ROUND METAL
DUCT
- 7 -
RETAINING
SCREWS
MOUNTING
SCREWS
(3.9X9.5MM)

Publicité

Table des Matières
loading

Table des Matières