Transport of the machine
To move the machine, take out the transport handle
(1) and to warrant a secure transport twist the handle
(2). ( Backup by screw head in transport handle)
Rocker lock
• To transport the rocker circular saw lock in
place the rocker lock in position (1).
Electrical connection
• Connect the machine with a CEE-plug to the power supply, provided supply should be 16 .
• Switch on the machine with the power switch, the motor runs up.
• Upon switching off the saw shaft is slowed down within 10 seconds.
Changing of rolling direction
The installed electrical motor is connected ready to operate. The connection
complies with the relevant VDE and DIN-regulations. The power supplied by the
customer as well as the used extension cable should comply with these regulati-
ons resp. the local regulations.
1
Seite:13