Installation Requirements - Quick RIDER 1700 W Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

BEFORE USING THE WINDLASS READ THESE INSTRUCTIONS CAREFULLY.
IF IN DOUBT, CONTACT YOUR NEAREST "QUICK
WARNING: the Quick
poses.
Quick
®
shall not be held responsible for damage to equipment and/or personal injury, caused by a faulty
use of the equipment.
The windlass is not designed for the loads that might occur in extreme weather conditions (storms).
Always deactivate the windlass when not in use.
Check that there are no swimmers nearby before dropping anchor.
For improved safety we recommend installing at least two anchor windlass controls in case one is accidentally
damaged.
We recommend the use of the Quick
Secure the chain with a further device before starting the navigation.
The solenoid unit or reversing solenoid unit must be installed in a point protected from accidental water contact.
THE PACKAGE CONTAINS:
- handle - bolts and screws (for assembly) - user's manual - warranty card.
TOOLS REQUIRED FOR INSTALLATION:
wrenche: 10 mm , 13 mm and 17 mm.
"QUICK
®
"ACCESSORIES RECOMMENDED:
HRC1002) - Foot switch (mod. 900) - Hydraulic-magnetic circuit breaker - Anchor chain counter (mod. CHC1102M and CH-
C1202M) - Radio control (mod. 1302,1352; 02, 302).

INSTALLATION REQUIREMENTS:

the upper and lower surfaces of the deck are as parallel as possible. If this is not the case, compensate the difference appropri-
ately (a lack of parallelism could result in a loss of motor power). The deck thickness must be included among the figures listed
in the table. In cases of other thicknesses it is necessary to consult a Quick
the passage of cables and chain; lack of depth of the peak could cause jamming.
FITTING PROCEDURE:
Remove excess material from the chain passage, refine and flatten with a specialized product (marine paint, gel coat or two
pack epoxy) to assure free passage for both chain. Position the upper section, inserting the gasket between the deck and the
base and connect the lower section to the assembly, inserting the shaft into the reduction unit. Fix the windlass by screwing
the nuts onto the fixing studs. Connect the supply cables from the windlass to the solenoid unit or reversing solenoid unit.
WARNING: before wiring up, be sure the electrical cables are not live.
RIDER 1700/2000W - REV001A
®
windlasses are designed to weigh the anchor.
®
hydraulic-magnetic switch as the motor safety switch.
windlass (on deck unit + motorgearbox) - solenoid unit/ reversing solenoid unit - base gasket
drill and drill bits: Ø 11 mm (7/16") - Ø 65 mm (2"1/2) hollow mill; hexagonal
anchoring RL control board (mod. 800) - Waterproof hand helds R/C (mod.
the windlass must be positioned with the gypsy aligned with the bow roller. Ensure that
when the ideal position has been established, drill four holes using the drilling template provided.
INSTALLATION
®
" DEALER.
Do not use the equipment for other pur-
®
retailer. There must be no obstacles under deck to
40 cm
(16")
max
5 mm
(3/16")
45°
90°
90°
90°
90°
GB
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rider 2000 w

Table des Matières