Provide a little bit longer pipe than the measurement.
Wire must be 1.5 m. longer than the refrigerant tube.
9
REAMING
Clean inside of the inner refrigerant tube.
While reaming, the tube end must be on the top of the
reamer to prevent any dust going back into the tube.
9
FLARING THE PIPE END
Flare both ends of the pipe with flaring kit by fitting the
flare nut on the pipe before flaring.Set the die on the
pipe so that pipe end is 0.5 mm. above top of the die.
Check if the pipe end is even and pertectly round.
9
WIRE CONNECTION AND TAPE COVERING
(see the picture on the right side)
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.