MINN KOTA DH 15 Mode D'emploi page 5

Table des Matières

Publicité

INSTRUCTIONS FOR DH-25
NOTE: Numbers in ( ) are item numbers referring to parts diagram.
A. Winch and Davit mounted together
1. Remove DeckHand cover (1) by removing cover screws, items (3) and
(4).
2. Place the base (18) and the davit (53) in your desired mounting location.
Make sure that when the DeckHand is operating or in a stowed position,
the anchor does not come in contact with the boat.
3. Make sure there are no obstructions under the mounting surface
prior to drilling. Mark at least 4 of the 6 pre-drilled bolt hole location pro-
vided in your base for drilling. Also mark all 4 pre-drilled bolt hole locations
provided in your davit for drilling. Drill through the marked holes in the base
using a
/
" drill bit, and through the marked holes in the davit using
21
64
drill bit.
winch assembly
treuil
davit assembly
bossoir
INSTRUCTIONS POUR LE DH-25
REMARQUE : Les numéros entre ( ) sont des numéros d'article servant de
référence entre la liste de pièces et les schémas.
A. Treuil et bossoir montés ensemble
1. Enlevez le couvercle (1) du guindeau en retirant les vis (3) et (4).
2. Placez le socle (18) et le bossoir (53) dans l'emplacement de montage
que vous désirez. Assurez-vous que quand le guindeau est utilisé ou en
position rangée, l'ancre ne touche pas le bateau.
3. Assurez-vous qu'il n'existe aucun obstacle sous la surface de mon-
tage avant de percer. Marquez l'emplacement d'au moins 4 des 6 trous
pour boulon pré-perforés dans votre socle pour les réaliser. Marquez aussi
l'emplacement de tous les quatre trous pour boulon pré-perforés fournis
dans votre bossoir pour les percer. Réalisez les trous marqués dans le
socle au moyen d'une mèche de 8,33 mm (
moyen d'une de 6,74 mm (
/
po).
17
64
/
"
17
64
/
po) et dans le bossoir au
21
64
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dh 25

Table des Matières