hager ST251 Mode D'emploi page 5

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Example (not to be used): either you have the micro-switch 2, 7 and 8
placed on OFF, or you have broken the connections 2, 7 and 8 on the
control panel using the template and the coding tool.
1
2
installation radio code
X
detecteur code
1
0
You now have a series of "0" and "1" which is the code to be program-
med on the keypad.
Warning: the code "0000000000" is not allowed.
G
Compose the following sequence to programme the installation radio
code:
State of
red light
0 1
1
0
indicator
L L
Type series of 10 keys
Press keys at the
("0" or "1")
same time for 3 sec
corresponding to the
until the red light
installation radio code
indicator goes out
NB: if programming is correct, the red light indicator comes on for 5 s.
NB: while programming, if you press an unauthorised key, or if you
leave more than 7 seconds between entries or if you do not press the
"0" and "1" keys at the same time, the red light indicator flashes and the
programming is incorrect. In this case wait for it to stop flashing before
starting the operation again.
5.6 Checking
G
You can check the programming of the installation radio code as
follows:
place the control panel in the test mode near you.
press the test button on the detector for 3 seconds: the red light
indicator will come on (the detector front panel has been removed):
- if the installation radio code is correct, the control panel responds with
a series of audible signals or vocal messages and a light indicator
flashes on the front panel,
- if the installation radio code is incorrect, the control panel responds
with a low-pitched signal and no light indicator comes on.
5.7 Fixing and testing the radio link
FIG. F
Fix the base of the transmission box (to the wall) using screws
G
and
and the dowels supplied.
G
Fold the front panel over the base and clip it on using the locking
pins.
Fit the set screw.
G
FIG. G
G
Press the test button on the detector: if the tested control panel
responds with a series of audible signals and the indicator flashes on
the front panel, then the radio link is OK.
5.8 Fitting the probes
FIG. H Flooding probe
Ground.
Metal plate.
Screw.
Wall.
Fixing the metal plate
G
The probe detects a minimum water level of 2 mm by immersion of
its metal flooding contacts.
It can be placed either vertically or horizontally on the ground, as requi-
red, to detect a minimum level of 2 mm.
The vertical position makes it easier to detect higher water levels
(probe raised up from the ground).
Just fix the metal plate supplied and flatten the probe up against it (the
probe will be held in place by its magnet).
Mark on the skirting board (vertical fixing) or on the ground (horizon-
tal fixing) the point where the metal plate is fixed according to the selec-
ted detection height.
If the probe is vertical, the metal plate fixing hole must be placed high
up.
To detect 2 mm water levels, the bottom of the plate must be fixed 1
to 2 cm from the ground.
To detect water levels in excess of 2 mm, you must raise the metal
plate to the required height.
Use the screw and dowel supplied to fix the metal plate.
3
4
5
6
7
8
9
X
X
1
1
1
1
0
0
1
Light
..............
1
0 1
indicator
L L
L
comes on
for 5 s.
Press keys at the
same time for 3 sec
until the red light
indicator goes out
Dowel.
Skirting board.
FIG. I Fitting the flooding probe
Probe.
Metal plate.
G
Position the magnetised probe on the metal plate.
10
NB: To simplify maintenance, the probe can be removed. We recom-
mend that you clean it at regular intervals to avoid dust collecting bet-
1
ween the probe and the ground.
FIG. J
and
Correct positions.
G
The connecting cable must be taut.
FIG. K Deep freezer failure probe
Probe.
Connecting cable.
groove.
Deep freezer seals.
G
Open the deep freezer and place the probe in the middle of the fro-
zen food.
G
To limit cold loss, you can use the cable bushing supplied with the
accessories.
G
Slide the cable into the cable bushing groove and stick the cable
bushing onto the freezer's seal.
FIG. L Mains supply probe
Plug and socket unit.
Connecting cable.
switch.
Correct position.
G
The plug and socket unit is placed upstream from the device (e.g.
aquarium) whose power supply it monitors. In the event of a power cut,
the probe responds either after a cut of more than 18 min or a cut of
more than 5 hours, according to your choice. You can choose the dura-
tion by means of a switch placed under the pin part of the plug and soc-
ket unit.
Once you have chosen the duration
tream of equipment to man.
FIG. M Minimum temperature probe
Inside wall.
Metal plate.
Fixing the metal plate
G
The minimum temperature probe measures the surrounding tempe-
rature. We recommend that you place it at least 1.50 meter above the
ground (fixed to an inside wall or placed on a shelf) in a room without
drafts.
The probe must be fixed near the heat source for no-freeze heating
(+8°C).
,
FIG. N Fifting the mininum temperature probe
Probe.
Metal plat.
G
Fix the metal plate using the screw and dowel supplied.
NB: to simplify maintenance, the probe can be removed. We recom-
mend that you clean it at regular intervals.
Position the magnetised probe on its metal plate.
FIG. O
Probe.
Water meter.
Incorrect position.
5
Magnet.
Incorrect position.
Cable bushing.
Correct position.
Incorrect position.
Device to be protected.
Time switch.
5 hour switch.
Incorrect position.
or
, connect the plug ups-
Dowel.
Screw.
Magnet.
Pipes.
Correct position.
Cable bushing
GB
Wall socket.
18 min
Shelf.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

St252St253St254

Table des Matières