Requirements For The Installation Location; Setup And Functioning; Overview - Graef H 9 Notice D'utilisation

Trancheuse universelle manuelle
Masquer les pouces Voir aussi pour H 9:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Manual Universal Slicing Machine H 9

Requirements for the installation location

For safe and flawless operation of the unit, the place of loca-
tion must meet these prerequisites:

Setup and Functioning

Overview

2
4
3
The unit must be set up on a firm, flat, level, and non-slip
base that has sufficient load bearing capacity.
Select the place of location so that children cannot reach
the sharp blade in the unit.
1
© Gebr. Graef GmbH & Co. KG / 02
1) Handle
2) Slicing thickness
control
3) Stainless steel car-
riage
4) Serrated blade
5) Carriage guide
profile
5
EN
27

Publicité

Table des Matières
loading

Table des Matières