Filling Function; Operation With 2 Floats; Operation With 3 Floats - DAB E-BOX 2G M Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22
Both with sensor operation and with pressure switch operation there will be an
automatic exchange of the order of switching on the two pumps at each start,
or an exchange between the two pumps every 24 hours, depending on the regulation
chosen in the DS_A2.
The two pumps will always be started alternately with a minimum interval of
2 seconds between one and the other.

12. FILLING FUNCTION

In filling, the floats, if present, are positioned in this order:
Electric probes

12.1 Operation with 2 floats

In operation with 2 floats, Pump P1 starts with the closed contact of the float B, while Pump P2 starts with the
closed contact of the float C.
Both pumps stop with the open contact of the float B.
The following table sums up the behaviour described:

12.2 Operation with 3 floats

In operation with 3 floats, Pump P1 starts with the closed contact of the float B, while Pump P2 starts with the
closed contact of the float C.
The pumps stop with the open contact of the floats A+B+C which controls the maximum level for both.
The following table sums up the behaviour described:
Sequence
Sequence
START
Float B = NC
STOP
Float B = NO
Pump P1
START
Float B = NC
Float A+B+C = NO
STOP
ENGLISH
ELECTRIC
PANEL
Pump P1
47
Pump P2
Float C = NC
Float B+C = NO
Pump P2
Float C = NC
Float A+B+C = NO

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

E-box 2g tE-box 2d m/tE-box 2d 40μf

Table des Matières