I.
Lifting Automation Hood Assembly
2
1
J. Connecting Fume Extraction Ductwork
OM-254 497 Page 20
2
3
1
!
Lift only from the lifting eyes
located at the top of the unit.
Be sure location is clear of all
obstructions, including util-
ity lines and roof overhangs.
.
See Section 4-3B for installa-
tion hardware torque values.
1
Lifting Eyes
2
Spreader Bar
3
Fixed Length Lifting Straps
Use all lifting points provided. Use
clevis connectors, not hooks, on
lifting eyes.
Use spreader bars to prevent dam-
age to unit. Use fixed length lifting
straps to connect to spreader bars.
See the Specifications in Section
3-1 for weight and dimensions of
the unit and to ensure lifting equip-
ment is of adequate capacity.
Lift unit separately, and connect to
ductwork after unit is in place.
250M Model Shown
!
Do not use equipment to
support site-installed ducts,
interconnecting piping, or
electrical services. All ducts,
piping, or electrical services
supplied by others must be
adequately supported.
.
See Section 4-3B for installa-
tion hardware torque values.
1
Angle Flange Adapter Duct
Connect fume extraction ductwork
to flange on hood.
250M Model Shown
300 963-8
Ref. 300963-7