Preparation; Operation Instructions - Pond Boss 52595 Instructions D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PREPARATION

Before beginning assembly or operation of product, make sure all parts are present.
Compare parts with package contents list and diagram. If any part is missing or
damaged, do not attempt to assemble, install or operate the product. Contact Customer
Care for replacement parts.
• Estimated assembly time: 10 minutes
• Tools Required for Assembly: knife

OPERATION INSTRUCTIONS

Step 1. Remove
assembled fountain
from packaging and
connect pump to floating
attachment assembly.
NOTE: For 1/4 HP, use the
coupler to connect the
pump.
Step 2. Choose a
fountain head for the
desired water effect, and
assemble your choice.
NOTE: For 1/4 HP, use the
nozzle adapter.
Step 3. Connect the
light to the cord (Part I)
by pushing the plug into
the light socket until it
is firmly seated. Hand
tighten the nut from the
plug to the socket.
Step 4. Connect the cord
for LED light to the sensor
by pushing the plug into
the sensor socket until
it is firmly seated. Hand
tighten the nut from the
plug to the socket.
Step 5. Connect the
sensor to the transformer
by pushing the plug into
the transformer socket
until it is firmly seated.
Hand tighten the nut from
the plug to the socket.
PLEASE CALL CUSTOMER CARE BEFORE RETURNING ITEM TO STORE: 1-888-755-6750
1
1/2 HP
2
1/2 HP
C
B
1/4 HP
Coupler
1/4 HP
D
C
B
3
Sensor
5
Sensor
D
E
E
4
cord for LED
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

52621

Table des Matières