Preparation; Operation Instructions - Pond Boss 52349 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PREPARATION

Before beginning assembly or operation of product, make sure all parts are
present. Compare parts with package contents list and diagram. If any part is
missing or damaged, do not attempt to assemble, install or operate the product.
Contact Customer Care for replacement parts.
Estimated assembly time: 5 minutes.
No tools required for assembly.

OPERATION INSTRUCTIONS

This kit includes a coupler and a diverter valve. To flow water to the fountain
nozzle only, go to Step 1A. To flow water to the fountain nozzle and a spitter,
go to Step 1B.
Step 1A. Connect the two
extension tubes with the coupler.
If no spitter is to be used, proceed
to Step 3.
Step 1B. Connect the extension
tubes to the diverter valve. Make
sure the arrow is pointing up and
the diverter valve is connected
as shown.
Step 2. For the use of the diverter
valve, connect 1/2 in. ID tubing
onto the second output of the
diverter valve. Connect the other
end of tubing to a spitter or other
water feature.
NOTE: Tubing and spitter are not
included.
6
VISIT WWW.THEPONDBOSS.NET FOR PRODUCT INFORMATION AND TIPS.
1A
2
1B

Publicité

Table des Matières
loading

Table des Matières