Partially Dedicated Systems (Indirect Connections); Simplified Installation - SystemAir fantech SER 450 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation examples (Cont'd)
* Drawings are illustrations only and actual port locations and airflow directions may vary, consult unit spec sheets.
It is the responsibility of the installer to ensure all ductwork is sized and installed as designed to ensure the system will perform as intended.
The amount of air (CFM) that an ERV will deliver is directly related to the total external static pressure (E.S.P.) of the system. Static pressure
is a measure of resistance imposed on the blower by length of duct work/number of fittings used in duct work, duct heater etc.
Partially Dedicated System (Indirect Connections)
• Stale air drawn from areas of contamination
• Fresh air supplied into ceiling return air plenum or grille
• ERV airflow should be balanced
SUPPLY IN
EXHAUST OUT
ERV UNIT
HRV UNIT

Simplified Installation

• Stale air drawn from return of air handler
• Fresh air supplied to return of air handler, further down
stream of ERV exhaust
• Air Handler blower must operate when ERV is providing
ventilation
• ERV airflow should be balanced
SUPPLY IN
EXHAUST OUT
ERV UNIT
HRV UNIT
CEILING RETURN AIR PLENUM
BALANCING DAMPERS
SUPPLY IN
EXHAUST AIR TO ERV UNIT
EXHAUST AIR TO HRV UNIT
RETURN AIR DUCT
BALANCING DAMPERS
SUPPLY IN
AIR HANDLER UNIT
12" BREATHER SPACE
AIR HANDLER UNIT
9
SUPPLY DUCT
fantech

Publicité

Chapitres

Table des Matières
loading

Table des Matières